Two Types of Cycle Time = Confusing

September 6, 2009

This blog post started as a parenthetical comment about cycle time in my last blog post. But the parenthetical grew out of control and I thought it would only confuse things in that post.

So, hopefully, it’s more clear here as a standalone post. In the last post, I explained that “cycle time” meant:

“Cycle time” is a term that means how long it takes to do a repetitive job each time.

Unfortunately “cycle time” is also used to mean how long it takes to get through an entire process from start to finish. This is confusing, I know. As an Industrial Engineer, I’ll take lumps on behalf of my profession for this poorly chosen terminology (are we to blame?). Some prefer to call this second form of cycle time (end-to-end elapsed time) by an alternative phrase “throughput time” or many in healthcare would call this “turnaround time.”

But the “cycle time” I mean here is the time between a single person (or machine) starting the first piece of work and that person (or machine) starting the second piece of work. Some would call this “operation time” or some other term.

If a doctor, for example, sees six patients per hour, the doctor’s cycle time is 10 minutes per patient. If it takes the patient 60 minutes from arrival to departure, then the “turnaround time” is 60 minutes (see why we don’t want to also call that”cycle
time?”)

I wish we didn’t have this confusing terminology, where “cycle time” means two things. I’m always havin to ask for clarification about “which” cycle time a person means (although “throughput time” is normally MUCH longer than “cycle time” for an individual operation in a process).

How do address that in your workplace?


Posted by Mark Graban on September 6, 2009 | Comments (3)

September 11, 2009
In response to: Two Types of Cycle Time = Confusing
Mark Graban commented:

Tim - no, takt time is the customer defined demand.


September 10, 2009
In response to: Two Types of Cycle Time = Confusing
Tim commented:

Would be better to call how "long it takes to do a repetitive job each time" - takt time


September 7, 2009
In response to: Two Types of Cycle Time = Confusing
Smith commented:

jbskjbklasg

POST A COMMENT
Display Name
captcha

Before submitting this form, please type the characters displayed above. Note the letters are case sensitive:

Advertisement
Advertisement
ARCbanner
NEWSLETTERS
Mid-Day Report
Innovation Strategies
Intelligent Manufacturing
Lean Enterprise



Please read our Privacy Policy

About Us   |   Advertising Info   |   Site Map   |   Contact Us   |   FREE Subscription   |   Affiliate Links   |   RSS
© 2009 Reed Business Information, a division of Reed Elsevier Inc. All rights reserved.
Use of this Web site is subject to its Terms of Use | Privacy Policy
Please visit these other Reed Business sites